Comparing FDS results to fire spill-plume calculations in BRE Annex D

The BRE guide Design methodologies for smoke and heat exhaust ventilation summarizes the advice available from the BRE Fire Research Station (UK)  to designers of atria and other buildings. Annex D of the BRE document compares different fire spill-plume calculation methods applied to a multistorey shopping mall. We compare Fire Dynamics Simulator (FDS) results to the calculations in Annex D.

Background

The purpose of the BRE guide is to provide practical guidance on the design of Smoke and Heat Exhaust Ventilation Systems (SHEVS) for atria and other buildings. It both reflects current knowledge and draws on the authors’ experience of design features required for regulatory purposes in many smoke-control applications. Annex D provides example calculations for a large-area smoke reservoir with a free plume rising from the spill edge.

FDS is the fire dynamics simulator developed at NIST (US). It is a computational fluid dynamics (CFD) model of fire-driven fluid flow. The software solves numerically a form of the Navier-Stokes equations appropriate for low-speed, thermally-driven flow, with an emphasis on smoke and heat transport from fires.

In this post, we compare the BRE Annex D calculations with FDS results.

Annex D Calculation

The example calculation represents a fire in a typical shop in a multistorey shopping mall. The fire is located in a shop and the smoke travels out of the shop and is channelled to a length of spill edge. The free plume rises from the spill edge to the ceiling. Details of the geometry are:

  • Shop width = 10 m, with no downstand facia.
  • Storey height = 5 m, for simplification.
  • Convective heat flux = 5000 kW, coming from a 3 m x 3 m fire.
  • Smoke is channelled directly to the spill edge over a length of 10 m.
  • No downstand at spill edge.
Figure 1: Idealized shopping mall.
Figure 1: Idealized shopping mall (from BRE Annex D). Click for a larger, clearer image.

The corresponding FDS model is shown below. The dimensions are as specified for the calculation. The smoke curtains on either side of the shop extend 2 m below the spill edge. The boundary of the problem is open, except for the floor, ceiling, shop back wall, and balcony. This is consistent with the smoke pattern assumed in Figure 1 for a free plume. The total Heat Release Rate was 7692.3 kW, with a 35% radiative fraction, giving a convective heat release rate of 5000 kW. The characteristic fire diameter (D*) for the fire is 2.2 m. The mesh size was 0.2 m, approximately equal to D*/10, a size that should give reasonable results.

Figure 2: FDS model of the fire in a shopping mall.
Figure 2: FDS model of the fire in a shopping mall. Click for a larger, clearer image.

Comparison of Example Calculation and FDS Results

We will now proceed through each step of the Annex D calculation and compare the calculations with the FDS results. An overview of the FDS results is shown in Figure 3.

Figure 3: FDS results showing smoke plume.
Figure 3: FDS results showing smoke plume at t=101 sec. Click for a larger, clearer image.

Calculation 1: Mass Flow Rate at Spill Edge

Following the procedure in Annex D, we first calculate the mass flow rate of smoky gases passing from the shop to the spill edge. Using BRE equation 5.7:

    \[M_{W}=\frac{C_{e}PWh^{3/2}}{\left[W^{2/3}+\frac{1}{C_{d}}\left(\frac{C_{e}P}{2}\right)^{2/3}\right]^{3/2}}\]

where:

M_{w} is the mass flow rate of smoky gases passing through a vertical opening (kg/sec),

C_{e} is the entrainment coefficient (0.34 kg/sec-m5/2 for small rooms),

P is the perimeter of the fire (m),

W is the width of the opening (m),

h is the height of the top of opening above the floor (m),

C_{d} is the coefficient of discharge for the opening (1.0 for no downstand),

Note: The number 2 is the equation os the result of combining various parameters and has dimension.

The calculated result is a mass flow rate of 29.2 kg/s. The FDS results give 36.3 kg/s, 25% larger than the calculation.

Calculation 2: Depth of Smoke Layer at Spill Edge

We calculate the depth of the smoke layer at the spill edge using BRE equation 5.11:

    \[D_{B}=\frac{0.36}{C_{d}}\left[\frac{M_{B}T_{l}}{\theta_{l}^{0.5}W_{B}T_{0}^{0.5}}\right]^{2/3}\]

where:

D_{B} is flowing smoke layer depth under the balcony (m),

C_{d} is the coefficient of discharge for the opening (1.0 for no downstand),

M_{B} is the mass flow rate under the balcony, calculated above (kg/sec),

T_{l} is the mass-weighted average absolute temperature of gas layer (K),

\theta_{l} is the temperature rise above ambient in the gas layer (K),

W_{B} is the balcony channel width (m),

T_{0} is the absolute ambient temperature (K),

The calculated result is a layer depth of 1.19 m. The FDS results give a layer depth at the center of the balcony edge of 1.63 m, 37% larger than the calculation.

Calculation 3: Entrained Flow in Spill Plume

The BRE document provides an approach in Annex E, but also notes that a simpler calculation using the Thomas method (equation 6.5) with the Poreh method (equation 6.6)  of calculating \triangle gives the same result, so we use the Thomas/Poreh approach. First calculate \Delta using BRE equation 6.6 and 6.4:

    \[C=0.3C_{m}\rho_{0}L^{2/3}\]

    \[\Delta=D_{B}+\frac{M_{b}}{CQ_w^{1/3}}\]

where:

C_{m} is the entrainment coefficient (0.44 for a free plume),

\rho_{0} is the density of ambient air (kg/m3),

L is the length of spill edge (m),

Q_w is the convective heat flux (kW).

Knowing \Delta, we then calculate the mass flow rate in the plume using BRE equation 6.5:

    \[M_{1}=0.58\rho\left[\frac{gQ_{w}L^{2}}{\rho cT_{0}}\right]^{1/3}(h_{b}+\Delta)\left[1+\frac{0.22(h_{b}+2\Delta)}{L}\right]^{2/3}\]

where:

M_{1} is the mass flow of smoky gases at height h_{b} (kg/s),

\rho is the density of warm gases at height h_{b} (kg/m3),

c is the specific heat of air (kJ/kg-K),

\Delta is the height of the virtual source below void edge (m), and

h_{b} is the height of rise of thermal plume above void edge (m).

The calculated result is a layer depth of 1.19 m. The FDS results give a layer depth at the center of the balcony edge of 1.63 m, 37% larger than the calculation.

h is the height of the top of opening above the floor (m),

A comparison of the Thomas/Poreh calculation (described in BRE) and FDS results for mass flow in the plume is shown in Figure 4. The shopping mall ceiling height is 15 m and the shop balcony height is 5 m, so the distance from the balcony edge to the ceiling is 10 m. The Thomas/Poreh calculation does not account for ceiling height, while the FDS calculation includes the hot gas layer at the ceiling. This layer affects flow about 2-3 m below the ceiling (Figure 5).

Figure 4: Comparison of flow entrainment in plume using Thomas/Poreh calculation and FDS results.
Figure 4: Comparison of flow entrainment in plume using Thomas/Poreh calculation and FDS results (time averaged).

Figure 5 shows a slice of the model with the velocity vectors for the FDS calculation at 100 sec. You can see the formation of layers at the balcony and shopping mall ceiling. Note that the FDS solution is dynamic and varies with time. This is a typical result.

Figure 5: Velocity vector slice for FDS results at 100 sec.
Figure 5: Velocity vector slice for FDS results at 100 sec. Click for a larger, clearer image.

Summary

The correlation between the calculations described in the BRE document and FDS is very satisfactory.  The BRE calculations are fits to a range of experimental data, not exact results for this particular problem. To me, this calculation provides confidence in both the BRE calculations and FDS.

References

H.P. Morgan, B. K. Ghosh, G. Garrad, R. Pamlitschka, J-C. DeSmedt, L. R. Schoonbaert, 1999, Design methodologies for smoke and heat exhaust ventilation,  BRE, Garston, Watford, WD2 7JR.

Acknowledgements

All calculations were performed using the FDS and Smokeview software. PyroSim was used to create and run the FDS models.

Comments or Questions

This post was written by Daniel Swenson. For comments or questions, send email to support@thunderheadeng.com.